Total Pageviews

Tuesday 27 December 2016

Ventured out to the garage with a recharged electric drill and made some "commitments"...
The round, 3" DOT legal tail light.  I think I will refinish the chrome ring/bezel in black.  You can see the issue with the tail section -- I've measured it many times, and it's not so much a twist, as a flaw in the original mould -- the LHS of the tail (in this pic) is "taller" than the right.  When the subframe is all welded up, some strategic application of heat might allow me to twist things a bit to compensate.


I decided to go with the DOT approve 4.25" headlight I am using with the xt supermono cafe racer.  I broke out the big hole saw and did some cutting.  The headlight will have to stick "out" from the fairing somewhat (typical of most endurance bikes) but it will be frenched in somewhat.  The used food container gives a sense of what it will look like.

Sunday 25 December 2016

Back to the Single

While waiting on a few parts and some milder weather...  the blizzard has kept us close to home on Christmas, so I set about the winter rebuild of the xt600 engine.

The process went as follows -- new (used) cases -- the latest model year that came with a kickstart -- 1990, I think.  Cleaned up at a transmission shop, old bearings removed, new bearings installed.  New xt600 cylinder with overbored piston -- .30 over, I think.  Starting to put it all together in the nice, warm inside environment...

The workstation -- a bit crowded, but it forces me to be disciplined and not leave tools and crap strewn about the place.  Ziplock bags are the greatest invention, as all the parts as removed are being put back into their place.

Case halves came together quite nicely.  Have a shopping list of new seals on the pink sheets, and since the photo I've installed the oil pump (with new o-rings), kickstart idler gear, and and kickstart spring mechanism.  Under all that went the shift detent arm and shifter.  Once I get the seals ordered (mainly the one for the balance shaft), I can finish the right side and start on the left.  New camchain will be installed as well.  I also plan to send the head off for a rebuild.  The cam journals look OK, so a valve job will suffice.  A very satisfying experience!

Tuesday 20 December 2016


 Sketched some ideas out for numberplate shapes and headlight mount location.

Saturday 17 December 2016

Fabbed a steel tube exhaust mount last weekend.
 Having the mig welder handy saved a pile of time, but I am still not happy with the "looks" of the weld bead when it passes through the mig tack.  I am confident there is enough penetration, but there is just a bit too much material present to get it to flow nicely as the weld bead passes through it.

Sunday 11 December 2016

Exhaust

The Black Widow headers have been joined to a GPR half-system.  I tweaked it somewhat to bring it in closer to the rearset (although not close enough to melt boots).  I also fabricated an aluminum bracket -- however due to it's length it's a temporary fix as it flexes too much.  A more solid muffler hanger will be made from steel tubing.